EMPLOYER
General Directorate of D.H.M.İ. (State Airports Operation)
PROJECT SCOPE
Construction of a concrete runway, a new apron, a new helipad, repair of the current apron and taxiway by excavating concrete and earth, refilling the excavated area with appropriate filling material and building concrete substrate, drying up a swamp, along with drainage works and electronic infrastructure.
LOCATION
Muğla
DATE OF AGREEMENT
07.07.2017
DATE OF COMPLETION
30.07.2019